On October 12th, the concrete pouring of the mid-span closure segment, measuring 40+4X64+40m, of the 337.75-meter-long continuous rigid-frame beam was successfully completed on the Duolun River Grand Bridge section of the Jitong Railway electrification renovation project by China Railway Electrification Bureau. This is the largest span continuous beam among all the electrification renovation projects on the Jitong Railway. The successful closure of the Duolun River Grand Bridge provides a strong foundation for the successful completion of the entire Jitong Railway electrification renovation project.

Duolun river form travelers project

Boyoun provided the main pier column formwork, 7 sets of main pier construction brackets, and 5 sets of suspended continuous beam construction cantilever form travelers for the Doulun river extra large bridge. Over the past year, we have overcome numerous technical challenges through innovation, optimized and improved our production processes, rigorously upheld our quality standards, and navigated external difficulties to ensure prompt and successful construction and harmonization of the Doulun river extra large bridge columns and continuous beam segments. We would like to express our gratitude to the China Railway Electrification Bureau Group for their trust and support of the Jitong Railway Electrification Project.

Early stage of cantilever form travelers construction

Early stage of cantilever form travelers construction

Middle stage of cantilever form travelers construction

Middle stage of cantilever form travelers construction

Features of the Cantilever Form Traveler

1. A standardized system design with high universality and strong replaceability lays the foundation for subsequent allocation and turnover to other projects.

2. The laser cutting machine has high processing accuracy for quick on-site assembly and reduces construction time.

3. Equipped with a fully enclosed protection system, it ensures the safety of construction workers and passing vehicles and pedestrians. The facade is made of modular galvanized steel wire mesh panels that are easy to install and durable.

4. The beam has both up and down ladders and side maintenance platforms. During the suspended pouring construction, the personnel can walk alongside the cantilever forming traveler  to ensure safety and improve work efficiency.

After-sale Service

Boyoun has innovated the "iron triangle" collaboration model by combining sales, technology, and after-sales. Through effective collaboration and thorough coordination across departments, they maintain effective communication with the project party. Through multiple discussions and adjustments, they provide tailored technical solutions, production processes, strict quality control standards, continuous professional on-site services, and real-time online technical support for the project party. They monitor all aspects of the process and keep track of information synchronized and up-to-date with the project, working together to overcome any challenges.

We would like to express our gratitude for the approval from Jitong Railway electrification renovation project by China Railway Electrification Bureau Group Co., Ltd. Boyoun will maintain its customer-centric principles and focus on customer value. Through excellent quality, leading technology, valuable services, and trustworthy branding, we will strive to become a top-notch solution provider for the domestic infrastructure industry and an internationally trusted supplier of infrastructure materials.

Gallery
  • Jitong Railway Duolun River Bridge Project
  • Jitong Railway Duolun River Bridge Project
  • Jitong Railway Duolun River Bridge Project
Products Used
Get In Touch

International Department: Room 2211-2212, Tower C of Wanda Plaza, Tongzhou District, Beijing 101118, China.

+86-13021287080

info@boyoun.cn

© Copyright 2020 Shandong Boyoun Heavy Industries Co., LTD. Design by BontopBlog