Underslung Form Traveler Cases

Jembatan Teluk Kendari Cable Stayed Bridge

Description

The construction of Jembatan Teluk Kendari Cable Stayed Bridge is aimed at supporting the connectivity of the development of the southern Kendari area, namely the Poetry and Bungkutoko Islands that will be developed into the industrial area, Kendari New Port, and the new settlement area.

Kendari Bay Bridge is 1.34 kilometer long, was opened to traffic on Oct. 22, 2020. It consists of the construction of a nearby road of 602.5 meter, main span (357.7 meters), side span (180 meters) and main thread of 200 meters.

Project Place: Kendari, Indonesia

Bridge Total Length: 933 meters

Bridge Deck Width: 41.5 meters

Construction Began: Apr., 2018

Completion: Oct., 2020

Bridge Status: Open to Traffic (Oct. 22, 2020)

Boyoun Supplied: Cantilever Form Traveler (Under Slung)

On-site Technical Guidance

Main Span: 358m                               

QTY: 2 Sets

Product Delivery Time: July, 2019

Product Status: Under Use on site. 


Gallery
  • Jembatan Teluk Kendari Cable Stayed Bridge
  • Jembatan Teluk Kendari Cable Stayed Bridge
  • Jembatan Teluk Kendari Cable Stayed Bridge
  • Jembatan Teluk Kendari Cable Stayed Bridge
  • Jembatan Teluk Kendari Cable Stayed Bridge
  • Jembatan Teluk Kendari Cable Stayed Bridge
  • Jembatan Teluk Kendari Cable Stayed Bridge
  • Jembatan Teluk Kendari Cable Stayed Bridge
  • Jembatan Teluk Kendari Cable Stayed Bridge
Products Used

Successful Cases

Get In Touch

International Department: Room 2211-2212, Tower C of Wanda Plaza, Tongzhou District, Beijing 101118, China.

+86-13021287080

info@boyoun.cn

© Copyright 2020 Shandong Boyoun Heavy Industries Co., LTD. Design by BontopBlog