Description

As Singapore's 7th fully-automatic MRT line, the Jurong Region Line (JRL) stretches 24 km and is predominantly composed of elevated viaducts. Short-line match-cast precast segmental box girder assembly is widely adopted for this key rail transit project under the Land Transport Authority (LTA) of Singapore.

Shandong Boyoun Heavy Industry supplied full-set custom-built steel formwork systems for multiple JRL contract packages including J103, J107, J109, J110, J115 and J120. The scope covers long-line precast segment mould, short-line precast segment mould, Stitching mold, Parapet mould & cable trough mold and cast-in-situ girder formwork. Our products support both precast yard beam fabrication and on-site cast-in-situ construction, contributing to the elevated rail transit development in western Singapore.

Supplied Product List

(1) J103: Long-line precast segment mould 

Designed for long-line bench precasting of large-span segmental box girders, compatible with curved and variable-depth segments. Hydraulic opening-closing mechanism ensures geometric matching accuracy among segments of a full span.

Singapore Jurong Line J103 box girder formwork

(2) J107: Parapet mould & cable trough mold Steel formwork 

 Integral forming for metro viaduct crash barriers and cable troughs. Component dimensional tolerances strictly comply with LTA specifications.

(3) J109: Stitching mold 

Dedicated formwork for high-altitude in-situ stitch joints between erected girder segments. Features easy assembly and disassembly plus anti-leakage performance, suitable for confined working space on viaducts.

(4) J110 / J115: Short-line precast segment mould

Short-line match-cast system equipped with fixed end-form and match-segment positioning system. The base form trolley enables translation, fine-tuning and rotation. It allows mass production of segments with varied curvatures and lengths within limited precast yard space. High precision is guaranteed for shear keys and matching surfaces to meet requirements for subsequent cantilever assembly and span-by-span erection.

Singapore Jurong Line J110 short line box girder formwork

Singapore Jurong Line J110 short line segmental box girder formwork

Singapore Jurong Line J115 short line box girder formwork

Singapore Jurong Line J110 short line segmental box girder formwork

(5) J120: Cast-in-situ mold  

Steel formwork for cast-in-situ box girders applied in special zones where precast erection is not feasible.

Singapore Jurong Region Line J120 Cast-in-situ mold

Stringent tolerance and surface finish requirements from Singapore standards LTA imposes demanding requirements on segment dimensions and concrete surface quality. Formwork detailed design and factory pre-assembly are verified item-by-item. Full sets of technical documents including English calculation reports, fabrication drawings and installation-operation-maintenance manuals are delivered for technical approval.

One-stop full-scope package delivery The supply scope covers complete formwork categories: long-line precasting, short-line match-cast precasting, stitch joints, crash barriers, cable troughs and cast-in-situ girders. Unified detailed engineering, factory pre-assembly and modular marine export reduce clients’ costs caused by multi-vendor procurement and interfaces.

 Benefiting from premium manufacturing quality, stable on‑site adaptability and precise LTA‑standard compliance, Boyoun's formwork solutions have earned solid word‑of‑mouth and high recognition within Singapore's rigorous infrastructure industry. This reliable track record enables Boyoun to secure successive supply orders for multiple JRL construction packages, establishing long‑term cooperative partnerships.

When the Jurong Regional Line is fully operational, the initial passenger volume is expected to be 200,000 passengers per day, and the long-term passenger volume is expected to reach 500,000 passengers per day. There will be 60,000 residential units within a ten-minute walking time of the Jurong Regional Line stations. Overall, the Jurong Regional Line helps to enhance the public transport capacity and connectivity in the western region of Singapore to support the long-term development of the western region of Singapore.

Gallery
  • Jurong Region Line in Singapore
  • Jurong Region Line in Singapore
  • Jurong Region Line in Singapore
  • Jurong Region Line in Singapore
Products Used
Get In Touch

International Department: Room 2507-2508, Tower C of Wanda Plaza, Tongzhou District, Beijing 101118, China.

+86-13021287080

info@boyoun.cn

© Copyright 2020 Shandong Boyoun Heavy Industries Co., LTD. Design by BontopBlog